TRAVEL-TRANSPORT: KUALA LUMPUR – End of toll collection at KL-Seremban Expressway, Salak Expressway from June 1
.
KUALA LUMPUR: The Malaysian Highway Authority (LLM) has announced that as of midnight, June 1, there will be no further toll collection at the Kuala Lumpur-Seremban Expressway and Salak Expressway.
LLM in a statement today said with the termination of the concession period, the toll charges on all routes exiting and entering the Sungai Besi Toll Plaza will be reduced by between 1 per cent and 50 per cent (between RM 0.40 and RM1.70).
“This termination will thus benefit nearly 130,000 vehicles passing through the toll plaza on a daily basis.
“Users who pass through Sungai Besi toll plazas will only need to pay the tolls within the North-South Expressway (PLUS) alignment that they are traveling through,” said the statement.
The statement further noted that all users can browse through the new toll rates at www.plus.com.my or the PLUS mobile app.
“Consumers are advised to comply with travel rules and signboards provided at the toll plaza to ensure smooth travels to their destination.”
All photographs, news, editorials, opinions, information, data, others have been taken from the Internet ..aseanews.net | [email protected] | For comments, Email to : Icarus d’ Greek | [email protected] | – Contributor